Description of project

Context : Tricastin nuclear power station wishes to modernize its facilities with secured buildings that will enable the facilities to work even during a natural disaster. A 20KV power line is therefore necessary to power the electrical facilities at the station during the construction phase as well as in normal operating conditions until a permanent internal power supply is available.

Services & Activities

- Detailed design studies;
- Preparation of the tendering specifications for EDF;
- Tenders assistance;
- Follow-up of works and tests;
- Assistance and industrial commissioning.